Skip to content
Thursday 23 July 2026London --:--Frankfurt --:--Zurich --:--
NewslettersSearchEN · DE
City PM

European business, markets and politics

FTSE 100
10,716.97
+1.24%
DAX
25,155.41
+0.58%
CAC 40
8,437.89
+0.89%
STOXX 50
6,316.99
+0.50%
  • Europe
  • Markets
  • Business
  • Economy
  • Technology
  • Politics
  • Opinion
More
GermanyFranceBankingAIEnergyFintechPropertyCapital Markets
  • Germany
  • France
  • Europe
  • Markets
  • Business
  • Economy
  • Technology
  • Politics
  • Opinion
  • DE
Monday 25 June 2018 3:49 pm

Take a look at the new London Overground trains with Wi-Fi and USB charging points finally being introduced from November

By: Rebecca Smith

Add as a preferred source on Google

The new London Overground walk-through trains have been unveiled by Transport for London (TfL) and feature Wi-Fi and USB charging points, as well as air conditioning.

They will finally be rolled out this year – after setbacks on the electrification work across the Gospel Oak to Barking route they will be introduced on.

The first of the new 54 trains designed and built by Bombardier Transport in Derby will carry almost 700 people per train. Initially, they will be rolled out between Gospel Oak and Barking to double capacity and replace older trains on West Anglia routes.

Read more: Bombardier could contest loss of £1.5bn contract for Piccadilly Line trains

TfL said the new trains will have "intelligent lighting and temperature control" for more comfortable journeys, along with digital information screens to provide customers with better real-time travel information.

Here's how they look:

 

(Click or tap on the images to see them in full screen)

 

Delays taking rollout off track

The new trains will now be tested on the new infrastructure on the Gospel Oak to Barking route which has been electrified, over the summer. The plan is for the first trains to enter passenger service on the Gospel Oak to Barking route by November – months later than first planned.

The cost of the £130m electrification project climbed to £172m after delays due to incorrect design and late delivery of materials.

Work on the upgrade originally began in June 2016, with TfL originally planning for electrification of the line to finish by the beginning of last July, but it was revealed that work had not been finished in time, with more closures needed.

In May, it was then said the rollout of trains would be pushed back to the summer after delays with the supplier for further software development.

Drivers will now undergo thorough training over the summer before the first train enters passenger service.

Jonathan Fox, TfL’s director of rail and sponsored services, said:

Our new state-of-the-art British built London Overground trains will be an exciting addition to London’s transport network and help boost capacity on some of the most busy and popular lines.

We are very keen to see them introduced into service as soon as possible so our patient customers can benefit from the fully air-conditioned, walk-through trains with handy USB charging points and real-time passenger information screens.

Over the summer, the new trains will undergo final rigorous testing and drivers will complete extensive training. We are now planning for the first trains to enter passenger service on the Gospel Oak to Barking route by November.

Read more: Roll-out of electric trains along Gospel Oak to Barking line delayed

 

Share this article

  • Facebook
  • X
  • LinkedIn
  • WhatsApp
  • Email

Similarly tagged content:

Sections

  • News

Categories

  • Business
  • Transport & Infrastructure

Trending Articles

  • Romesh Ranganathan makes it hard to defend the BBC

  • Exclusive: Rugby World Champions Cup set to be mothballed

  • Tax rises ‘guaranteed’ as Healey faces £22bn black hole from Burnham spending plans

  • John Healey becomes Chancellor as Andy Burnham names top Cabinet appointments

  • ‘We are going to run out’: Mitie marks eleventh mega takeover of 2026

More from City PM

  • No air conditioning on the Tube? Blame Sadiq Khan

    Opinion
    Crowded London Underground platform during summer heat wave, passengers fanning themselves to stay cool
  • Three ways Andy Burnham can avoid Keir Starmer’s mistakes

    Opinion
    Andy Burnham, Mayor of Greater Manchester, speaking at an event
  • I’m 60, please don’t give me a Freedom Pass

    Opinion
    Close-up of a blue Oyster card against a white background, highlighting its role in public transportation payment systems.
  • The Debate: Should Britain set up a No 10 North?

    Opinion
    Andy Burnham supporters rallying with banners and signs at a political event, showcasing enthusiasm and solidarity
  • How Swatch and Audemars Piguet pulled off the ultimate high-low watch collab

    Life&Style
    Swatch watch collection showcasing vibrant colors and innovative designs on a sleek display, perfect for fashion enthusiasts
  • Renault Scenic E-Tech 2026 review: An electric SUV for our times

    Life&Style
    Renault Scenic E-Tech showcasing sleek design and advanced features in latest tech review
  • Will AI trigger the end of net neutrality?

    Tech
    Close-up of vibrant fibre optic cables with glowing blue and green lights, symbolizing fast internet connectivity and data...
  • The PlayStation Portal 2026 review: Japanese innovation, hampered by UK infrastructure 

    Life&Style
    PlayStation Portal handheld device showcasing sleek design and advanced gaming features against a modern backdrop.
CityPM

Independent European business, markets and political news for decision-makers.

Morning Briefing

Europe

  • Germany
  • France
  • Europe
  • UK & Ireland

Business

  • Markets
  • Banking
  • Technology
  • Energy
  • Property
  • Fintech

Editorial

  • Opinion
  • Editorial Policy
  • Corrections
  • Contact

Company

  • About City PM
  • Privacy Policy
  • Terms of Use
  • Cookie Policy
© 2026 City PM Ltd · Published by CityPM Media, Bahnhofstrasse 65, 8001 Zürich, Switzerland
Privacy · Terms · Cookies · Facebook