Skip to content
City PM
  • Germany
  • France
  • Europe
  • Markets
  • Business
  • Opinion
  • DE
  • Germany
  • France
  • Europe
  • Markets
  • Business
  • Opinion
  • DE
Wednesday 16 September 2020 2:44 pm  |  Updated:  Wednesday 16 September 2020 3:33 pm

Silvertown Tunnel to cost £2bn over next 30 years

By: Edward Thicknesse

Add as a preferred source on Google
A controversial tunnel which will connect Greenwich with London’s Docklands will cost Transport for London (TfL) almost £2bn over the next three decades.

A controversial tunnel which will connect Greenwich with London’s Docklands will cost Transport for London (TfL) almost £2bn over the next three decades.

Although the actual construction of the Silvertown Tunnel remains at £1bn, figures from the capital’s transport operator show that the overall cost for building, maintaining and operating the tunnel will be £65m a year from its scheduled opening in 2025.

Over the 25-year payment term, this adds up to £1.6bn, which rises to a total of around £2bn when interest payments are included.

The overall cost is around three times higher than was initially anticipated, with the tunnel first forecast to come in at around £600m.

Green party London Assembly member Caroline Russell said that Mayor Sadiq Khan had been trying to hide the actual cost of the project, which has attracted fierce opposition since it was first announced.

“The Mayor has not been straight with Londoners. Last year he told us Silvertown Road Tunnel would cost £1bn, in March it was £1.2bn, and now we finally see what TfL will actually pay and it’s heading for £2bn. This is outrageous”, she said.

“When my predecessor on the Assembly first started opposing this scheme in 2012 Transport for London described the cost as being about £600 million, we are stratospheres above that now and TfL will be saddled paying for this, even in our uncertain future.”

Read more

Why can the Faroe Islands build faster than Britain?

Underwater roundabout in the Eysturoy Tunnel, featuring modern engineering and design, credit Getty Images

She added that Khan should “do the decent thing” and cancel the project, which has been opposed on the grounds that it will worsen air quality and congestion in the vicinity.

In a statement, Transport for London said that the additional costs were not linked to the construction of the project, which remains at £1bn.

“All payments towards the Silvertown Tunnel will be funded from a road user charge which will cover both the Blackwall and Silvertown Tunnel and will only begin once it is available for use, with payments linked to the performance of the contractor on key criteria such as availability. 

“These charges will not only repay the construction costs, but will also cover the ongoing operational costs for the tunnel for 25 years as well as any maintenance and asset renewal required”, it said.

A spokesperson for the Mayor said that the project was necessary because the current infrastructure was “antiquated and worn out”.

“Sadiq has been clear that he doesn’t want to replace one health crisis with another, and he is determined that our city’s recovery from coronavirus will be clean, green and sustainable.”

The new tunnel will be covered by the extended Ultra Low Emissions Zone (ULEZ) from 2021, they added.

Read more

Arsenal launch £7k-a-head VIP package with seats behind dugout and player meeting

High-resolution image of a business meeting with diverse professionals discussing a project in a modern office setting

Share this article

  • Facebook
  • X
  • LinkedIn
  • WhatsApp
  • Email

Similarly tagged content:

Sections

  • News

Categories

  • Transport & Infrastructure

Related Topics

  • London buildings, bridges and landmarks
  • Transport for London

Trending Articles

  • Citroën 2CV returns as a £13,000 electric car, and the timing is no accident

  • The former African gold miner taking on the billionaire Issa brothers

  • Wimbledon: HMRC set to slap Sinner and Noskova with £1.6m tax bill

  • Barclays and Lloyds back calls to digitalise UK markets and unlock £33bn boost

  • Rachel Reeves to unveil next steps for ring-fencing reform at Mansion House

More from City PM

  • Why can the Faroe Islands build faster than Britain?

    Opinion
    Underwater roundabout in the Eysturoy Tunnel, featuring modern engineering and design, credit Getty Images
  • Arsenal launch £7k-a-head VIP package with seats behind dugout and player meeting

    Sport Business
    High-resolution image of a business meeting with diverse professionals discussing a project in a modern office setting
  • Archduke play at the Royal Court: A fascinating comedy about radicalisation

    Life&Style
    Archduke standing in regal attire at the royal court, surrounded by historical artifacts and opulent decor.
  • Fideres Study Finds TfL Fare Zones Disproportionately Burden Ethnic Minority Commuters

    Business Wire
  • Andy Burnham will be ‘in hock’ to the bond markets whether he likes it or not

    Opinion
    Andy Burnham speaking at a Labour Party event, addressing supporters with banners and flags in the background.
  • I’m 60, please don’t give me a Freedom Pass

    Opinion
    Close-up of a blue Oyster card against a white background, highlighting its role in public transportation payment systems.
  • LSE draws up ‘worst case scenario’ US listing flight risk

    Markets
    London Stock Exchange building exterior with financial district skyline, symbolizing global market activity and economic t...
  • Blackstone looks to shed $2bn of stakes in private investment funds

    Markets
    Blackstone skyscraper with modern architecture under clear blue sky, symbolizing financial power and urban development.

City PM — European politics, business and analysis.

Europe

  • Germany
  • France
  • Europe
  • UK & Ireland

Topics

  • Business
  • Markets
  • AI
  • Technology
  • Opinion
  • Energy

More

  • Politics
  • Economics
  • Fintech
  • Legal
  • Sport
  • Life

Company

  • About City PM
  • Editorial Policy
  • Corrections
  • Contact
  • Terms of Use
  • Privacy Policy
  • Cookie Policy
© 2026 City PM · Published by CityPM Media, Bahnhofstrasse 65, 8001 Zürich, Switzerland
About · Editorial Policy · Corrections · Contact · Privacy · Facebook