Skip to content
City PM
  • Germany
  • France
  • Europe
  • Markets
  • Business
  • Opinion
  • DE
  • Germany
  • France
  • Europe
  • Markets
  • Business
  • Opinion
  • DE
Tuesday 26 May 2015 1:01 pm

In pictures: Why TfL escalator and lift work can take so long

By: Jessica Morris

Add as a preferred source on Google

Maintaining the heavy duty escalators and lifts which support London's tube network is a mammoth task – and this helps to explain why replacements and refurbishment can take such a frustratingly long time.

It all boils down to the fact these escalators and lifts aren't subjected to an ordinary degree of wear and tear, according to Transport for London (TfL).

Escalators and lifts on the tube network are used by around 1.265bn customers annually, and generally operate in both directions for a period of up to 20 hours a day, seven days a week, 364 days a year.

But because of the number of passengers they're used by, as well as the number of trips they have to perform, they're classed as heavy engineering machinery meaning upgrades can take a very long time.

David Waboso, LU Capital Programmes Director describes the size and difficulty of the tasks:

It can take up to 24 weeks to carry out an overhaul, particularly when spare parts have to be manufactured from scratch and installed deep underground in confined spaces.

Physical and geological considerations mean that every escalator on the Underground network is custom-built for its location.

Many components are made bespoke by the manufacturers, which mean a stockpile of spare parts can't be built up.

A typical heavy-duty escalator weighs 40 tonnes, has a vertical rise of 15 metres and would span over 37 metres if was laid out flat. 

Some installed pre-WW2 are actually embedded into the station's structure, such as those which were at Embankment Station, requiring a lot of building work to create enough space to fit a new escalator.

Below are pictures of escalator refurbishments at Embankment Station which was closed to the Bakerloo and Northern lines for 10 months.


TfL replaced four escalators at Embankment Station (Source: Getty)

 


View from lower landing of the escalator with new decking panels (Source: TfL)

 


View of the new upper truss section from the machine room (Source: TfL)

 


Upper landing during removal of the old escalator (Source: TfL)

 


Incline with old escalator completely removed (Source: TfL)


Embankment Station (Source: TfL)

 


Upper machine chamber, the old machines have been removed as they are life expired (Source: TfL)

 


Installation of temporary trackway ready for delivery of new escalator truss sections (Source: TfL)

Share this article

  • Facebook
  • X
  • LinkedIn
  • WhatsApp
  • Email

Similarly tagged content:

Sections

  • News

Categories

  • Business
  • Transport & Infrastructure

Related Topics

  • Transport for London

Trending Articles

  • Harry Styles at Wembley Stadium review: running through the grief

  • Nottingham Forest owner Marinakis announces £210m stadium plans

  • I’ve taken the best train trips in the world. Here are my 5 favourites

  • Nothing fails to file accounts months after dissolution threat

  • Burnham tax plans spark investor rush to bank capital gains

More from City PM

  • Why are so many people abandoning sex toys on the Tube?

    Opinion
    Abandoned doll on London Tube seat holding City PM newspaper, capturing urban life and public transport atmosphere
  • TfL dispel concerns over Queen’s tennis final tube havoc

    Sport Business
    Without specific context from the article, Im unable to generate an accurate alt text. Could you provide more details from...
  • London’s heatwave is a boon for Lime bikes

    Transport & Infrastructure
    Lime faces growing scrutiny over its safety record.
  • Fideres Study Finds TfL Fare Zones Disproportionately Burden Ethnic Minority Commuters

    Business Wire
  • GRIDSERVE Reports 45% YoY Growth, as UK’s Most-Used Charging Network Proves the Commercial Case for EV Infrastructure at Scale

    Business Wire
  • For all their charm, digital banks still leave me tearing my hair out

    Opinion
    Digital bank interface showing user-friendly dashboard with financial analytics and transaction history on a modern screen
  • Yieldmo Expands YMax.ai, Bringing Greater Control, Transparency, and Predictive Intelligence to Open Web Advertising

    Business Wire
  • Uber slams £340m London cabbie case as ‘completely unfounded’

    Tech
    Shares in Uber tumbled more than five per cent in pre-market trading as earnings missed analyst expectations.

City PM — European politics, business and analysis.

Europe

  • Germany
  • France
  • Europe
  • UK & Ireland

Topics

  • Business
  • Markets
  • AI
  • Technology
  • Opinion
  • Energy

More

  • Politics
  • Economics
  • Fintech
  • Legal
  • Sport
  • Life

Company

  • About City PM
  • Editorial Policy
  • Corrections
  • Contact
  • Terms of Use
  • Privacy Policy
  • Cookie Policy
© 2026 City PM · Published by CityPM Media, Bahnhofstrasse 65, 8001 Zürich, Switzerland
About · Editorial Policy · Corrections · Contact · Privacy